Thursday, February 17, 2011

Feedback on Klang Valley Mass Rapid Transit (KVMRT)

The recent launch of the Klang Valley Mass Rapid Transit Project’s proposed Sungai Buloh-Kajang MRT line was received by the public with mixed responses. Many of us think that start work order was given too soon without consulting the public feedback, especially those affected by the project. I strongly feel that there is a need to assess the surrounding issues before rolling out the project. These issues affect the people and should be given utmost priority.

Among the surrounding issues are:
1)  Dubious Tender Process
There was a serious lack of documentation and specifications before the tender award to Gamuda-MMC. From the website of Suruhanjaya Pengangkutan Awam Darat (SPAD) at http://www.kvmrt.com.my, we can only see limited information about Project Background, Noise Level Table, Station Facilities, and Technical & Safety Features. I personally do not call it a specifications as they do not elaborate in detail the Building and Engineering requirements. There was a joke calling it a build first, plan later approach. It makes you wonder how the tender company can calculate and quote for the total project cost without referring to any specifications.

SPAD is also risking its credibility by not doing their homework of identification of potential location and budgetary planning but instead asking vendors to propose and compete amongst themselves using the “Swiss Challenge” approach. This approach tends to give the upper hand to the spec-in company. Unless the full specification is disclosed, other the vendors are left in a black-box competition with a high chance of losing the bid. This is not a fair deal as the final evaluation is NOT really comparing apple with apple. Choosing Gamuda-MMC’s proposal directly as a spec-in benchmark without open tender is one of the worst example of favoritism from the SPAD commission. It will also reflect very badly on the governance of the project.

2)  Environmental issues
A proper EIA assessment needs to be done on the areas affected by the construction of MRT. This will ensure that the development does not have an effect on the environment and eco-system and create hazards like flood and landslides. Furthermore, the affected areas and their surrounding community must be given fair chance to voice out their concerns on the MRT project.

3)  Impractical Design
I am also against showing the fictitious station views or artist impression without proper architectural information because it is like a tool to deceive the public into believing that the project is viable. A nicely drawn station may turn out to be of limited use after all. We want to see the actual station design, the capacity, as well as passenger flow needs to be carefully examined to remove any potential inconveniences to the commuters.

Some ERL or LRT stations became the laughing stocks of the people because of its many flaws and impractical design.
A good example is the nice Tasik Selatan ERL station, which has a very narrow entry and exit path and thus cannot cater for a large crowd. Furthermore, to enter or exit the station to either Tasik Selatan or TBS, one has to go up, down, up and down again. Imagine the hassle a traveler with heavy luggage that has to drag the bag up and down the escalator or lift. The lift was also very slow despite only serving Level G and 1.
Another example is the Salak Tinggi ERL station. Despite a fantastic shell like design, the waiting platform has a store room located just in the middle of the waiting and commuting area, thus forcing people to walk near the yellow line in order to pass through to the other end. This exposes the traveler to unnecessary risks.


4)  Coverage and Focus
It seems the project aims to cover 3 different niches of needs – general public, tourists, business. However, there seems to be disproportion in these focuses.

a) Tourist Spots
The emphasis on tourist spots however is lacking. If tourism is really on the centrefold, then we would expect the following stations at the country’s top tourist spots:
i)       Between the Parlimen, Taman Tasik Perdana, National Monument, Carcosa Seri Negara, National Planetarium, Asian Sculpture Garden and many more.
ii)     Between Taman Tasik Titiwangsa, Istana Budaya and National Library.
iii)    Batu Caves, FRIM, Templer Park etc*.
iv)     Zoo Negara*.
Note*: As it is far away from the main line, we will have to wait and hope that it will be built it in future.

b) Densely populated Areas
The focus on areas with dense population is also not clear. Some stations are questionable in nature as it does not have huge population. It is hoped that the story of underutilized stations like Abdullah Hukum will not be repeated again. Among those are Taman Koperasi and Taman Mesra. These two are definitely not hotpots.

i)       Taman Koperasi station is the inner most housing area after Tmn Lingkaran Nur and Taman Rakan. Instead of Taman Koperasi, why not a station between Taman Rakan, Mahkota Cheras or Sg Long? Those areas are more densely populated and it has two IPTS around the vicinity. It would be a strange thing why the densely populated area have no stations and majority of the people have to travel a few kilometres to reach the station.
ii)     Taman Mesra station is only useful to two adjacent housing areas - Tmn Delima and Tmn Mesra and hence is economically infeasible. It can be postponed until later when the need arises. Saujana Impian station is also in nearby vicinity. There is still a need to add access road to Kampung Sg Sekamat and Tmn Sri Sekamat to Saujana Impian to facilitate access.
iii)    Cochrane (PPR Cochrane) to Pasar Rakyat seems a bit far. By right Pasar Raykat is not a popular hotspot and hence a station there will be of not much help. There is no station to cover major areas where there are many schools near the following:
(A) SJK(C) Chin Woo, SJK(C) Kung Min, SK(L) Jln Pasar 2, SK(L) Jln Pasar 1, SK Jln Pasar and
(B) SMK(P) Bandaraya, SJK(C) Jln Imbi. A station near Jalan Davis is more desirable than the one in Pasar Rakyat.

Public convenience should the top priority but unfortunately it is not emphasized in certain areas.

c) Business Areas
Probably the only thing that we can applaud on the proposed MRT map is on its extensive coverage of business areas in PJ, Damansara up to Sg Buloh. The only area that is far from coverage is Mont Kiara and it would probably be covered by the feeder bus.


5)  Operational issues

a) Slower long distance travel 
Given the long distance of the coverage of 60km and 35 station, the train stops would incur on average every 1.7km. This will limit the train speed to average 45km/h, plus a wait time of 10-15 seconds per stop. The travelling time end-to-end (Kajang - Sg Buloh) with MRT is around 1 hour 30 minutes. A person driving on Sprint highway (47.8km) will need just 48 minutes. Similarly, a person driving on North-South expressway (46.3km) will need just 47 minutes. Travelling with MRT on long distance does not help to save time at all. People will still prefer to drive as the duration is shorter! Short distance travelers and people going into or out of the city centre will probably benefit more than those travelling longer distance.

b) Connecting Journey
From the diagrams supplied by SPAD (http://media.kvmrt.com/pdm/Alignment_Map.pdf and http://www.kvmrt.com.my/media/pdm/MapKVMRT-B_opt.jpg), the linkages to other modes of transportation relies on two stations - Maluri and Pasar Seni. One can’t help but to ask why is there no MAIN interchange station at KL Sentral to monorail and Putra. Having looked at the monorail line, there seems to be no way to connect from monorail to Putra LRT without exiting the station and walk for some distance.
The connecting stations must be carefully planned so that it is convenient for users to change trains. The disjunction between Putra and STAR LRT interchange at Masjid Jamek has longed been ridiculed by locals and foreigners and we cannot afford another joke like this.

c) Poor maintenance
The existing LRT stations and surrounding areas are badly maintained. The Central Market station, in particular looks good on the front, but at the backyard leading to Menara Dayabumi, you can see moulds, sands, patches of water and vandalized wall. I don’t suppose the SPAD people has ever visited the LRT station from Dayabumi. It is really a shame if a foreign visitor came and saw it. I sincerely hoped that the current LRT and the future <RT infrastructure will be properly maintained.

Frequent power failure of the Putra LRT system is also another major concern as it causes service disruption that affects the people, especially the working class.

Missing/ confusing signage is also another problem area to look into. Some station does not even have a station name written on the pillars so that commuters can easily recognize the current station. The voice prompt is sometimes too weak and can be overridden by the loud squeaking sound of the rail track.

As a conclusion, if we were to build world class transit system, we will have to go back to the basics first. Jumping steps and taking the easy way out will not help us to go far. Planning and debates should be held before the specs are discussed. We do not have to travel far to learn how to plan a good and effective transit system. Have a look at our neighbours, Bangkok and Singapore. These are good examples of well planned mass transit system. More information can be found at http://www.urbanrail.net/as/asia.htm

Written by Steve Teoh

Saturday, January 1, 2011

事事关心:马来西亚华人政党与回教党关系

改编自:范若兰 - 中山大学亚太研究院,东南亚研究2010年第4􀀁
种族政治回教政治化目前是马来西亚政治的主导因素, 政党政治则是其表现形式之一, 华人政党与回教党关系的变化对马来西亚政治发展和种族关系都有一定影响。
就因为这样,以华人为基础的政党, 包括执政党马华公会和民政党以及反对党民主行动党与回教党的关系演变是举足轻重的。要了解这些关系演变,我们就必须先了解回教党及其理念。
回教党及其理念
1951年成立到1974, 回教党关注的主要是马来人特权, 强调“马来亚是马来人的, 主张: ( 1) 马来语成为国语和唯一官方语言; ( 2) 建立以马来文化为基础的民族文化; ( 3) 保护马来人特权。这定位与巫统基本相同。
1982年是回教党发展的分水岭。回教党提出新战略: 改革回教社会使之成为回教国的基础 ,并 [可兰经] 和圣训为基础, 回教法为法律,将回教原则全面引入国家经济社会教育政治体系, 并使回教在日常生活中遵循回教价值观行为规范。转变后的回教党最重要的变化是新领导人用回教原则取代了狭隘的马来种族主义。
回教党最坚持的目标是将马来西亚建成回教国, 奉行回教生活方式实行回教法,包括“回教刑法” ( hudud)。在1999年获得吉兰丹州和丁加奴州的执政权后, 该党将回教国理念付诸实践, 具体包括以下几方面:
(1)  提倡“与回教相伴的发展理念,注重回教精神。
(2) 遵守回教生活方式, 所有不符合回教教义的活动都属非法。
(3)  实施“回教刑, 1993 年、2002年吉兰丹州和丁加奴州分别颁布回教刑法。该法本质上非常不人道,更因违背联邦宪法而没有真正执行。
回教党的种族理念是基于回教原则, 而不是基于马来种族主义。从回教党的党章、回教国文件 (Dokumen Negara Islam)、历次大选宣言和领导人讲话, 可将其种族政策概括如下:
(1)  保证宗教信仰自由和其他自由
(2)  保证公正和平等
(3)  保证多元族群和多元宗教
回教党员认为回教国完全可以保证非回教徒的权利和自由。回教党的基本特点是去种族和重回教。回教党不赞成马来人主权和马来人特权, 强调公正和所有种族平等, 因此回教党反对新经济政策,认为它既不公平也不公正, 充满贪污和滥权, 其他种族的穷人和非巫统支持者没有受惠。
可惜,说了这么多,在民联最近推出的竞选承诺中,竟然把回教国文件的承诺都妥协了。马来人主权以及新经济政策都没有列在内。
虽然回教国下的民众虽没有种族之分, 有回教徒和非回教徒之分, 国家最高权力只能由回教徒掌握, 非回教徒的自治权是基于回教主权 下的授予; 非回教徒可以实行世俗法律, 但公共法律是回教法, 这导致非回教徒在某种情况下也要遵守回教法。正如哈迪阿旺所说, 在回教国下, 非回教徒在涉及公众利益事务时也必须遵守回教法。
华社如果真正了解这项宗旨,都不会支持把回教义在日常生活中加注在非教徒身上的。
华人政党面对回教党: 反对还是合作?
马华公会、民政党和行动党以华人为基础。他们首先要争取本种族选民支持, 其次还要争取其他种族选民支持。总的来看, 执政党马华公会和民政党对回教党的态度是始终反对的, 而反对党行动党对回教党的态度则是在反对与合作中反复。
70年代以前, 华人政党与回教党基本没有交集。
80年代在回教复兴运动的大背景下, 回教党与巫统的竞争日益激烈, 但华人政党因其宗教主义而反对与其接触。当时的华人政党不论是执政党还是反对党都坚决反对回教党
1990 年大选,国阵与反对党阵线的竞争非常激烈, 反对党(包括行动党)在人民阵线旗帜下共获57个国会议席, 回教党赢得吉兰丹州的执政权。但两线制并没有维持下去。回教党于1993 年在吉兰丹州出台的《回教刑法是导致双方决裂的关键因素。马华公会坚决反对回教党, 批评《回教刑法是极端神权思想的典型例子
1995年大选前,行动党的态度有了180度的转变,为了避免被指责支持《回教刑法宣布反对回教党的做法,并退出人民阵线反对党阵线的分裂使国阵取得辉煌胜利。
1999年大选中, 行动党和回教党正式结盟, 与公正党和人民党共同组成反对党联盟替代阵线(BA)。行动党最终只获得10席。它的失败是因为失去华人选票。华人对行动党与回教党结盟不满,也担心国家动乱。回教党则因胜利而信心大增,哈迪阿旺2001628日声称回教党如在下届大选获得执政权, 必定会在马来西亚建立回教国 ,引起朝野反对。
2001911事件发生后, 行动党与回教党划清界线,再次宣布退出反对党联盟替阵
巫统为重获马来人支持, 消解1999年大选挫折, 首相马哈迪不顾反对于2001 929宣布马来西亚已是回教国,这也让行动党有机会攻击国政及马华。马华的立场始终是反对回教化的。
2004 年大选在新形势下展开, 国阵大获全胜。行动党与回教党决裂, 重获华人支持,获得12个议席,成为国会中的第一大反对党。而回教党议席大幅下挫, 只获得6, 还丢掉了丁加奴州, 只在吉兰丹州以微弱优势保住政权。
2008年大选前反对党再组人民联盟,回教党提出新的大选宣言, 不再提回教国主张, 而是提出〈福利国概念。福利国所关注的民主、民生、自由、民族团结等问题, 与行动党的大选宣言有不少相同之处。国政却一味在打发展牌,结果反对党获得空前的胜利,国政遭遇了大海啸,除了被否决2/3多数国会议席外,在州政权上未能夺回吉兰丹州, 还失去了吉打州、霹雳州、雪兰莪州和槟城的政权。华人在此次大选中对回教党的态度值得关注。回教党不再提回教国理念, 而是提倡福利国, 使得一些对国阵政府腐败盛行极为不满的华人也投票给回教党。当选区中只有巫统和回教党候选人时, 一些华人宁愿投票给回教党, 而不投票给巫统, 因为巫统某些领袖一党独大, 霸道的行为, 华族选民看在眼里, 实在忍无可忍。为了教训巫统, 华族选民投了反对党。
总结
行动党出于本身政治考量,在回教课题上反复的支持及退出反对党联盟。一方面,如要推翻国阵, 行动党就必须与所有反对党合作; 另一方面, 行动党的世俗性使它坚持反对回教国, 这就决定了行动党与回教党合作时的犹豫态度。而回教党最终目标就是回教国理念,一有机会他们便会把它付诸实施。公正党则有许多前巫统党员反对〈回教国文件〉所鼓吹的放弃马来人主权以及新经济政策等不平等的议程,因此民联的100日维新议程中就没有废除马来人主权以及新经济政策的承诺。民联如果执政,这许许多多的矛盾点就会浮出台面。
国政本身的问题是在贪污腐化,滥权,暴虐及一党独大的形象。只有洗脱这个负面的形象,人民尤其是华社的支持才会回流。国政本身的强点是中庸政治,因此不应该因为回教党的威胁而去强调回教国,才能够获得非回教徒及华社的支持。马华公会由始至终坚决反对回教化, 而且从来没有妥协过。
回教国及回教法一直以来都是华社不能接受的。因为它会直接的影响华社的生活。如果神权抬头,回教法就会取代取代世俗法甚至宪法,在公共事务上我们的生活肯定受到影响。不论是国政或民联,在下一届大选大家都必须放弃强调回教国,才不会令华社排斥。